We were also restricted in height 'from existing ground level to ridge level'.
So, we decided to dig 75cm into the 'existing ground' (it's a 2 acre site so you wouldn't even notice it) and build our house to the height we wanted it to be.
Needless to say, we ran it by our planners first and they approved it.
This option might just save you having a low pitch. I know ours is at 28 degrees and a lot of roofers thought it was very low for natural slate. THeir thoughts were that the wind would catch them easier and possibly blow them off.
Pudzer