I've put in for my planning, they have come back to us with a few bits of missing information, however we've discovered that the engineer didn't do the site layout in the way we wanted (couldn't get him to send a copy before submission and the site is the wrong size - too big, house needs to move 12 meters and the garage is facing the wrong way)
Anyway he was to be redrawing it 2 weeks ago and now has come back to say that he'll put it back in as it is and we can make changes later.
Now, how flexible are they when it comes to making changes later, i though it would have to go through some process again thus taking more time and it would be easier to sort it now.BTW I'm in the UK and he's in Irelandso its been impossible to control this.
Anyway he was to be redrawing it 2 weeks ago and now has come back to say that he'll put it back in as it is and we can make changes later.
Now, how flexible are they when it comes to making changes later, i though it would have to go through some process again thus taking more time and it would be easier to sort it now.BTW I'm in the UK and he's in Irelandso its been impossible to control this.