Just read this article by John Fitzgerald , for a guy with such public reach who is taken serious I am surprised how little research he had done before penning this article.
Yes building a big nuclear power plant is expensive and yes we are not a big country with vast energy needs.
In this article he did not even bother to reference the modern trend to move to small modular reactors .
These are not new tech as the USA and others have been using same to power their aircraft carriers and submarines since the 1960s.

Rolls Royce have been developing small modular reactors for the UK with a price tag of 1.8 billion sterling and 470 MW power output , enough to power a city of 500000 people .
That's not too large or too expensive in the modern world .
Is it on its own the solution to our energy needs no but it helps diversify our sources , can you imagine what will happen if our renewables are not functioning and we need to imports from outside the state but those countries are also having energy supply problems ? we will be left hanging in the wind .

We need to put our energy needs first and be pragmatic nuclear options should be part of that plan as should oil and gas exploration of what resources we have , its all well and good having an open economy but we need to insulate ourselves at the same time .

 
I agree. One comment in the article is particularly odd. He says that "Because we have already invested so much in renewables, going nuclear now would be a very poor match. We need supplementary power sources when the wind doesn’t blow or the sun doesn’t shine. However, nuclear, being so expensive, needs to run full-time to recoup its costs – switching up and down to match the wind would not make sense.". That comment makes no sense. We will always need a minimum of 40% non-renewable capacity for when the wind doesn't blow and the sun doesn't shine. Our current plan is that we meet that with hydrocarbon burning stations. If we had nuclear power and we ever have excess capacity we can sell into into our EU and UK interconnector.
 