Hi guys, I'm looking for some advice on how to handle a situation I have stupidly found myself in, Apologies if this is not the right thread.
A handyman, used before and reasonable, was called to replace tiles around a bath. He sent a quote for tiles, adhesive and a couple more bits which I paid for. After stripping tiles, he noticed there were big gaps between the bath and walls, so would have to "build-out" the walls around the bath before tiling. It was becoming a bigger job, so we decided then to replace the bath with a shower tray and door. He sent a quote for shower tray and door which I again paid.
Materials were dropped to my house today, and I just noticed a delivery sticker on the shower tray with the name of a different plumbing centre than the one the quote was from. This piqued my interest so I started looking closer.
The shower tray is a different brand than the one quoted.
The tiling quote has tiles quoted to cover 20 square yards, I measured the area myself and it looks to be around 9. There are 3 bags of 20kg bostik (premium brand from what I can tell) adhesive, this looks to be enough to do the job 3 times over. 1 20kg bag of a different adhesive arrived.
The shower door hasn't arrived yet but I'm afraid it will be the same.
As I have used this man before and trusted him, the job was pretty much paid for before starting, and I don't know how/when or if to pull him on this until the job is completed.
Any advice would be greatly appreciated!
A handyman, used before and reasonable, was called to replace tiles around a bath. He sent a quote for tiles, adhesive and a couple more bits which I paid for. After stripping tiles, he noticed there were big gaps between the bath and walls, so would have to "build-out" the walls around the bath before tiling. It was becoming a bigger job, so we decided then to replace the bath with a shower tray and door. He sent a quote for shower tray and door which I again paid.
Materials were dropped to my house today, and I just noticed a delivery sticker on the shower tray with the name of a different plumbing centre than the one the quote was from. This piqued my interest so I started looking closer.
The shower tray is a different brand than the one quoted.
The tiling quote has tiles quoted to cover 20 square yards, I measured the area myself and it looks to be around 9. There are 3 bags of 20kg bostik (premium brand from what I can tell) adhesive, this looks to be enough to do the job 3 times over. 1 20kg bag of a different adhesive arrived.
The shower door hasn't arrived yet but I'm afraid it will be the same.
As I have used this man before and trusted him, the job was pretty much paid for before starting, and I don't know how/when or if to pull him on this until the job is completed.
Any advice would be greatly appreciated!