We built our house and moved in last August. At the time we ordered stairs and 19 doors from a timber frame company to be supplied + fitted. They fitted the stairs and 15 of the doors last Setember. After fitting 15 of the doors we picked, they then discovered they hadn't any more in their stock.
To make a long story short, they contacted the supplier who said they never remeber providing the type of door we had and they would have to order 4 more specifically from the manufacturer in Indonesia! 7 months later after alot of failed promises and numerous phone calls we got the 4 last doors, which then turned out to be different from the originals because they were'nt measured correctly by the timber fram comp to order them. They then re-ordered a 2nd time and we're told we'll have them by the end of this month which will be mean we'll have waited 11 months for all the doors.
I paid for the stairs as there was no issue with the supply fitting of them. I've told them I want a discount for the hassle + delays and they've offered a discount of €600, which I'm not happy with.
Just wondering what people feel would be a reasonable discount given the above?
I feel if I had waited 11 months and now ordered doors I could them at a considerably lower price now vs. what they are charging me.
thanks
To make a long story short, they contacted the supplier who said they never remeber providing the type of door we had and they would have to order 4 more specifically from the manufacturer in Indonesia! 7 months later after alot of failed promises and numerous phone calls we got the 4 last doors, which then turned out to be different from the originals because they were'nt measured correctly by the timber fram comp to order them. They then re-ordered a 2nd time and we're told we'll have them by the end of this month which will be mean we'll have waited 11 months for all the doors.
I paid for the stairs as there was no issue with the supply fitting of them. I've told them I want a discount for the hassle + delays and they've offered a discount of €600, which I'm not happy with.
Just wondering what people feel would be a reasonable discount given the above?
I feel if I had waited 11 months and now ordered doors I could them at a considerably lower price now vs. what they are charging me.
thanks