Building an extension - 250 square feet. Lots of glass, only about 350 blocks required. Was going to be 9" hollow with 80mm dry line, now switching to 100mm block, 100mm cavity, 100mm block.
Builder wants extra 1300 to build in cavity, as wider foundations, ties, blocks, time, etc. - this seem ok?
Builder wants extra 1300 to build in cavity, as wider foundations, ties, blocks, time, etc. - this seem ok?