Just in case it's of any use to anyone else...
My Eir 12 month contract finishes tomorrow and I didn't want to pay the much higher non-new customer monthly cost. 30 days ago I called them and gave them notice that I was ending the contract at the end of the 12 months. They didn't really give me any hard sell to keep me. Just to be clear, the service was perfect and the few times that I needed to contact them they were easy to contact and very helpful, but I just didn't want to pay the out of contract price.
About 3 weeks ago I ordered VM (500Mbps + basic TV for €45 p.m. with €105 credit after a few months) via Switcher.ie. Immediately VM contacted me about installation. I asked them if I could hold off until 13th July and they said that that was fine. In the meantime they installed the cable from the pavement shore to the cable box outside my house while I was out.
Today the Actavo guy arrived c. 10am (my slot was 8am-1pm) and completed the installation inside the house which took about an hour. He had to drill another hole in the external wall beside the OpenEir cable. But the inside installation was cleaner than the OpenEir one as he routed the stripped small fibre optical cable stripped of its shielding to the living room and the wall box. The VM model/router has an integrated ONT so there's no ONT mounted on the wall and the thin optical fibre goes direct to that.
Obviously he left the OpenEir cable/terminator box/ONT alone. Their installation was a bit messier with the fully shielded optical fibre cable (about the thickness of a coaxial cable) brought into the living room from outside. The Actavo guy said that this isn't strictly compliant with fire regulations and that the optical fibre cable should be stripped inside the house. I'm not that bothered but the stripped cable is a lot tidier/more discreet than the ugly black shielded cable. But it's not a huge deal.
The broadband and TV service were enabled and are working fine and I just had to log into the modem/router to change the admin password and WiFi name and password so that I don't have to reconfigure devices that were connection to my old network.
All in all it went pretty smoothly from the point of view of scheduling things so that there was no down time and minimal payment for two separate services and also the physical and technical installation processes.
My Eir 12 month contract finishes tomorrow and I didn't want to pay the much higher non-new customer monthly cost. 30 days ago I called them and gave them notice that I was ending the contract at the end of the 12 months. They didn't really give me any hard sell to keep me. Just to be clear, the service was perfect and the few times that I needed to contact them they were easy to contact and very helpful, but I just didn't want to pay the out of contract price.
About 3 weeks ago I ordered VM (500Mbps + basic TV for €45 p.m. with €105 credit after a few months) via Switcher.ie. Immediately VM contacted me about installation. I asked them if I could hold off until 13th July and they said that that was fine. In the meantime they installed the cable from the pavement shore to the cable box outside my house while I was out.
Today the Actavo guy arrived c. 10am (my slot was 8am-1pm) and completed the installation inside the house which took about an hour. He had to drill another hole in the external wall beside the OpenEir cable. But the inside installation was cleaner than the OpenEir one as he routed the stripped small fibre optical cable stripped of its shielding to the living room and the wall box. The VM model/router has an integrated ONT so there's no ONT mounted on the wall and the thin optical fibre goes direct to that.
Obviously he left the OpenEir cable/terminator box/ONT alone. Their installation was a bit messier with the fully shielded optical fibre cable (about the thickness of a coaxial cable) brought into the living room from outside. The Actavo guy said that this isn't strictly compliant with fire regulations and that the optical fibre cable should be stripped inside the house. I'm not that bothered but the stripped cable is a lot tidier/more discreet than the ugly black shielded cable. But it's not a huge deal.
The broadband and TV service were enabled and are working fine and I just had to log into the modem/router to change the admin password and WiFi name and password so that I don't have to reconfigure devices that were connection to my old network.
All in all it went pretty smoothly from the point of view of scheduling things so that there was no down time and minimal payment for two separate services and also the physical and technical installation processes.