Has anybody got an experience with using this material for flooring in place of a concrete screed.
I am looking into screeding over my UFH system and was interested in what the Jerry Beades website had to say about Easyscreed. They seem to suggest that the fact that a 35mm layer of Easyscreed is equal to a 75mm layer of standard screed means that UFH costs will be reduced by using a thinner layer. However, a lot of other sources suggest that a 75mm layer of screed is required to act as a heat sink for optimum UFH operation - has anybody used a thinner layer of Easyscreed with UFH?
I am looking into screeding over my UFH system and was interested in what the Jerry Beades website had to say about Easyscreed. They seem to suggest that the fact that a 35mm layer of Easyscreed is equal to a 75mm layer of standard screed means that UFH costs will be reduced by using a thinner layer. However, a lot of other sources suggest that a 75mm layer of screed is required to act as a heat sink for optimum UFH operation - has anybody used a thinner layer of Easyscreed with UFH?