However most trades use cordless power tools these days.
Which would be covered by the client.But... if they see a live socket... in the batteries get plugged.
Not the home owner yet. The final payment will be when the sale closes.It probably was not an issue in the past but with the current costs of energy it is a live topic. Are you as the house owner not paying the electricity bill now, then all the energy costs are your cost.
I’m imagining thousands. The heat pump has been running in the house 24/7 since the floors were drying out in about October. 50% of the bill is irrespective of what duration any trades spent on site.How much are we talking about here?
Built 3 houses although all direct labour once electric connected I had to pay the bill.In a bit of a situation with the contractor hired to build our house. They have built the house but some of the finishes, kitchen and stairs have been finished by other parties hired by us. They are seeking the electricity bills cost to be paid 50% by us due to as they are terming "our contractors electricity use". Its a fixed price contract and no provision for service charges as far as I can see in the contract.
Do they have any legitimate claims here? Is this normal?
Utility bills follow the owner. Building a house requires energy, what next, a diesel bill for driving to and from the site???Not the home owner yet. The final payment will be when the sale closes.
Not the home owner yet. The final payment will be when the sale closes.
I’m imagining thousands. The heat pump has been running in the house 24/7 since the floors were drying out in about October. 50% of the bill is irrespective of what duration any trades spent on site.
'Not the home owner yet...' suggests they are buying a new build from a developer rather than a situation where they commissioned a builder to build a one-off home on property they already owned. It's stage payments rather than a sale to close when you commission a build on your property.so who owns the house? is it being built for you on your property? or are you buying a new build?
perhaps, although their first line of the OP says:'Not the home owner yet...' suggests they are buying a new build from a developer rather than a situation where they commissioned a builder to build a one-off home on property they already owned. It's stage payments rather than a sale to close when you commission a build on your property.
I believe it's more typical for the connection to be put in the name of the land owner for a one-off build, I've never heard of a developer trying to add on such costs.
Yeah true, need to OP to clarify.perhaps, although their first line of the OP says:
"In a bit of a situation with the contractor hired to build our house"
so it isnt immediately clear to me.
The developer would then pick up the bill.Yes apologies for the confusion. It is: buying a new build from a developer
We do not own the site.
The developer would then pick up the bill.
but some of the finishes, kitchen and stairs have been finished by other parties hired by us.
Was running the heatpump to dry the floor faster the builder’s call, or yours or one of your contractors (flooring say) looking to get in/out sooner?I’m imagining thousands. The heat pump has been running in the house 24/7 since the floors were drying out in about October. 50% of the bill is irrespective of what duration any trades spent on site.
That was completely the builders decision. They told us when the flooring fitters and tilers could get on site.Was running the heatpump to dry the floor faster the builder’s call, or yours or one of your contractors (flooring say) looking to get in/out sooner?
The heatpump is the only thing that is likely to build up a big bill, it could be drawing a couple of kilowatts 24/7 if windows are open etc. Charging a battery drill takes about 0.1kWh, so €0.04 at current electricity rates. Maybe some lighting for your trades people, assuming the house is LEDs then you could throw in another €0.50 a day assuming they turned on every light and just left them on.
They told us when the flooring fitters and tilers could get on site.
I’d say you might prepare for an argument on that point. The fact is drills, saws and tools like that used by your floors/kitchen people use a trivial amount of electricity, €20-€30 would cover them all. The heating is different though and I doubt the builder would be raising this unless there’s a chunky enough bill. I don’t think heating ‘needs’ to be run to dry the floors to the builders finish, if you’d had the flooring laid after the sale completed you may have had to run the heating at your cost at that point to get the concrete to the moisture level required by your fitters.That was completely the builders decision. They told us when the flooring fitters and tilers could get on site.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?