All pre-letting and bought within the last month and/or few months - we are moving and this will be our first time to rent out this house: The following are all in the context of freshening up and repairing - we are doing the work while we are still here for the next few months)(had we done it earlier - we could have got the enjoyment from everything)
Capital item or Rental Income deductible?
Electric Hob - replacement (yet to be wired)
Electric Oven - replacement
Timber Shirting Boards - some indoor
Garden fence/screening new (Timber and screws/fittings/labour)
Fence Panels replacements
Electric Switches - replacements (several)
Bath, Shower, Sink, Toilet, Tiles - replacements
Plasterboard - replacement - (Kitchen and bathroom - due to tile removal)
Plasterboard - removal of a door and walling off to create an understairs den/office
Rockwool - wall and attic firewall reinforcement
Skimming tape and paste
Paint - wall paint and wood trim (Labour ourselves this year)
Window Glass - replacements of 5 windows (repair also)
Window hinge and handle - repair
Kitchen sink & New tap - replacements as current set - old and in need of a freshen up
Plumber & Carpenter
3 wooden venetian blinds - yet to be bought/replaced
Fridge - new one required
Flooring in Hall and Living room - yet to be replacement - existing one is very old laminate
Carpenter for this also
Oil Boiler - has to be checked - most likely needs to be replaced (cost and labour 2000)
Sofa - will need to buy
Beds - two will need to be bought
Wardrobe - 1 required
Chest of drawers - 1 required
Dishwasher - none in house
Outside Light - none over front door
Front door - on reflection we will have to wait a year or two to replace this!
Capital item or Rental Income deductible?
Electric Hob - replacement (yet to be wired)
Electric Oven - replacement
Timber Shirting Boards - some indoor
Garden fence/screening new (Timber and screws/fittings/labour)
Fence Panels replacements
Electric Switches - replacements (several)
Bath, Shower, Sink, Toilet, Tiles - replacements
Plasterboard - replacement - (Kitchen and bathroom - due to tile removal)
Plasterboard - removal of a door and walling off to create an understairs den/office
Rockwool - wall and attic firewall reinforcement
Skimming tape and paste
Paint - wall paint and wood trim (Labour ourselves this year)
Window Glass - replacements of 5 windows (repair also)
Window hinge and handle - repair
Kitchen sink & New tap - replacements as current set - old and in need of a freshen up
Plumber & Carpenter
3 wooden venetian blinds - yet to be bought/replaced
Fridge - new one required
Flooring in Hall and Living room - yet to be replacement - existing one is very old laminate
Carpenter for this also
Oil Boiler - has to be checked - most likely needs to be replaced (cost and labour 2000)
Sofa - will need to buy
Beds - two will need to be bought
Wardrobe - 1 required
Chest of drawers - 1 required
Dishwasher - none in house
Outside Light - none over front door
Front door - on reflection we will have to wait a year or two to replace this!
Last edited by a moderator: