Just looking for a little advice here! My plumber (brother) is starting the first fix on my new build and I have installed a 3" precast floor with a 6" screed between the ground floor and first floor. I now need to core down through the floor for the rads and the electrics. There should be about 40 2" holes and I am after getting a couple of prices to do the work from specialised concrete drilling companies. Its gonna work out at €800 for the whole job (pardon the pun
). I know someone who took on this job himself and spent weeks drilling (and breaking expensive drill bits!). I was wondering if this price seems reasonable to ye and does any one have any suggestions on if this job could be made easier using specific equipment as a DIY Job? Im not afraid to take it on once it doesnt end up taking me weeks and slowing down the first fix plumbing/electrics!!!!
Salmon
Just looking for a little advice here! My plumber (brother) is starting the first fix on my new build and I have installed a 3" precast floor with a 6" screed between the ground floor and first floor. I now need to core down through the floor for the rads and the electrics. There should be about 40 2" holes and I am after getting a couple of prices to do the work from specialised concrete drilling companies. Its gonna work out at €800 for the whole job (pardon the pun
Salmon