Don't know if im posting this thread in the correct place if not i'm sorry. I'm looking for some advice here, i ordered 2 oak beams for a new house that i'm currently building when the beams came the were manufactured incorrectly should have been a 45 degree pitch instead the ones i received were 35 degrees. I rang the company the following day and got through to a very helpfull fella who recognised the error with the drawings And he told me he would sort it out . They manufactured the correct beams and i got them this week and they took away the wrong ones, however they want me to pay a penalty of a quarter of the orignal contract price as they say that they are left with the beams . I have in my possession an order form from the company including a drawing showing a 45 degree angle.Just wondering what should i do? The New beams are in place and the company have been paid the original contract price.