Just thinking, hearing on the news now about the exorbitant cost of yet another new bike shed in University Hospital Kerry, following on on the Leinster House bike shed fiasco and the massive overruns or excessive costs of Greenway facilities around the country, are these "needed" projects somehow regarded as a soft touch for contractors in the new touchy feely attitude towards projects deemed environmentally friendly projects, especially cycling facilities? And I post this as a regular and passionate cyclist myself...
I think the Kerry Greenway is now projected to cost in excess of €70m up from an original estimate of circa €20m.
There is currently a grossly overengineered cycle path being constructed on the outskirts of Castlebar, alongside the N60 which is coming in at a price tag of over €4m, I think (or over €1m per km).
To put that in context, when that original stretch of road was widened back in 1969, round when I was born, the total cost of that "major" road project was £1m. Also for 50 odd years the residents of that area pleaded for the council to provide a footpath out that road, in the face of at least 20 deaths and many other injuries to pedestrians. The authorities and the NRA at the time resisted such appeals for years, so that eventually the locals, like on so many other local communities, got together and constructed a gravel path along the green verge.
Now the TII in their newfound awareness of safety issues for pedestrians (perhaps motivated by the fact that so many IPAS centres are situated in rural areas with pedestrians that are frequently oblivious to the dangers inherent in walking unlit or without hi viz on rural Irish roads) have bought in big time to large scale over-engineered cycle/pedestrian greenways. So TII's solution to this problem is rather than provide basic gravel footpaths in a wide variety of much needed rural areas, is to go whole hog and engineer 2m wide tar-macadammed cycleways with a price tag similar to the same km of rural road in specifically targetted localised areas.
In fact the reality is if the TII decided as a policy to ensure that all national primary and secondary roads had a hard shoulder, then this alone would hugely benefit both motorists and pedestrians and cyclist alike. But even if they didn't go that far and worked to ensure that every km of national primary and secondary road has a segregated gravel cycle/walkway along side the road (even if this meant purchasing the land alongside to provide same where there is insufficient green verge available) I believe this would be a much more beneficial and optimum expenditure of TII funds than these super sexy, over engineered facilities which invariable peter out between (or in some cases may not even begin at) urban centres in any case so that cyclist and pedestrians are ultimately forced back onto an inadequate and dangerous road verge in any case.
But I guess there are some people making loads of money out of the current TII policy so those vested interests have to be looked after.
I think the Kerry Greenway is now projected to cost in excess of €70m up from an original estimate of circa €20m.
There is currently a grossly overengineered cycle path being constructed on the outskirts of Castlebar, alongside the N60 which is coming in at a price tag of over €4m, I think (or over €1m per km).
To put that in context, when that original stretch of road was widened back in 1969, round when I was born, the total cost of that "major" road project was £1m. Also for 50 odd years the residents of that area pleaded for the council to provide a footpath out that road, in the face of at least 20 deaths and many other injuries to pedestrians. The authorities and the NRA at the time resisted such appeals for years, so that eventually the locals, like on so many other local communities, got together and constructed a gravel path along the green verge.
Now the TII in their newfound awareness of safety issues for pedestrians (perhaps motivated by the fact that so many IPAS centres are situated in rural areas with pedestrians that are frequently oblivious to the dangers inherent in walking unlit or without hi viz on rural Irish roads) have bought in big time to large scale over-engineered cycle/pedestrian greenways. So TII's solution to this problem is rather than provide basic gravel footpaths in a wide variety of much needed rural areas, is to go whole hog and engineer 2m wide tar-macadammed cycleways with a price tag similar to the same km of rural road in specifically targetted localised areas.
In fact the reality is if the TII decided as a policy to ensure that all national primary and secondary roads had a hard shoulder, then this alone would hugely benefit both motorists and pedestrians and cyclist alike. But even if they didn't go that far and worked to ensure that every km of national primary and secondary road has a segregated gravel cycle/walkway along side the road (even if this meant purchasing the land alongside to provide same where there is insufficient green verge available) I believe this would be a much more beneficial and optimum expenditure of TII funds than these super sexy, over engineered facilities which invariable peter out between (or in some cases may not even begin at) urban centres in any case so that cyclist and pedestrians are ultimately forced back onto an inadequate and dangerous road verge in any case.
But I guess there are some people making loads of money out of the current TII policy so those vested interests have to be looked after.