Hi, when you are about to lay a semi-solid/engineered floor, how do you go about this? We got our floor delivered from the factory in packs and I hear you either glue or float the wood directly onto the concrete floor??Is this correct and if so which is the better method or is there much difference. Do you need an expert in to do this or is it quite simple to do yourself?