Considering a site that has planning permission but it's an elevated site and if anyone was to build, a nearby ESB pole and wires (pole not located on the site but wires traversing it) pretty much dominates the roofline and would get in the way of development - as well as being an eyesore and possible hazard.
What kind of issues/hassle would I be facing getting this moved, ie ballpark cost for ESB to move it, and would you need landowner permissions to divert/locate it elsewhere etc... Trying to ascertain if it would be a dealbreaker.
What kind of issues/hassle would I be facing getting this moved, ie ballpark cost for ESB to move it, and would you need landowner permissions to divert/locate it elsewhere etc... Trying to ascertain if it would be a dealbreaker.