The MIL is gutting her scullery and putting in whole new kitchen. Two of the walls are external mass concrete and I think she should dry line them but as the job is so small no one will want it and as I will probably get the job I’m looking for some advice.
Is there anything else I should watch out for?
- Do I need to put plastic between the batons and the wall?
- Should I use brass screws in place of steel nails?
- Should I put in insulation between the wall and plaster slab?
- Hope this isn’t stupid – is there 2 sides to the slab? One for plastering and the other for skimming – taping the joints and filling the nail holes (this would be my preferred option).
Is there anything else I should watch out for?