I'm worn out! In the middle of a direct labour build and am fed up with tradesmen coming onto my site, agreeing a fixed price for a job and then, halfway through the job, phoning me and whining about how its going to be extra because of such a such a problem.
Last week it was the carpenters saying the blocks were slighytly too high to fit the window boards properly. This week its the plumber saying the showers that I chose are different than normal and they will cost more to put in. Oh man, am I fed up with this crap!
My answer to them is that if the job takes less than it's supposed to, they don't hand me back the change. Also, they all get ample opportunity to walk around the site prior to pricing.
What's the real line on this? Can they continue to do this and get away with it? These tradesmen seem to be a law unto themselves.
Simply don't accept this nonsense from them. If they've underestimated the quote, then that's their problem.What's the real line on this? Can they continue to do this and get away with it?
Theory versus reality.
There is no such thing as fixed price, whether you go direct labour or with a builder.
There are no such things as an enforceable penalty clause for breaching a fixed price.
Tradesmen do not provide written specs as they do not stick to them anyway.
There are agreed prices which are all subject to change.
They all whinge like mad.
They have a life time of experience at justifying money demands.
You have no experience at rebuttal as you do not know the trade in question.
Your strongest bargaining time is when they have done more work then you have paid them for.
A price not agreed before hand will be always higher than you expect
Verbal communication is always misunderstood.
Written communication is always misunderstood.
Standing and point will be misunderstood.
In a complete house build you have to be on site every day at every turn to avoid mistakes which you will pay for.
You have three choices.
1. Refuse to pay - in which case they walk off the job and leave you worse off then you had paid. Remember you hired them because there quote was low. The next guy will be higher but maybe no better.
2. Pay for their mistakes with without much debate in which case you get the job done in time.
3. Fight tooth and nail over every penny – if you mind confrontation.
I chose number 2 even though I'm fine with confrontation.
The previous posters advice will not apply as they are talking about one off small jobs. Different story on a house build.
The previous posters advice will not apply as they are talking about one off small jobs. Different story on a house build.
Do you refer to me? In which case I was talking about a house build. You got one thing right, self builders generally don't have a clue, why would they? if your not up for it hire a project manager/QS and let them do their job. they will worry about budget on your behalf and will make sure everybody knows exactly what they must do for the fee they charge.
You wont be surprised to hear that I dont agree with the others.
1. Architects charge 10% of the estimated build cost - thats too much. 18 grand for basic planning permission drawings / 50 grand for detail drawings and 6 stage inspections.
2. engineers charge much much less - say 4 grand for detailed drawings that a builder and tradesmen can work of.
3. These days people generaly design their own house in their head and just need someone to do the drawings. - use an engineer or technician.
4. The structural numbers - the most vital info on the plans - come from a structural engineer - not an architect.
5. Project management costs way too much. You will end up standing on site pointing out the bits that they have missed to the builders.
6. QS costs about 1.5 - 3% and is a pointless spend for a house build as no builder will use them
Architects, Project managers & QS's will add 80 grand+ to a 420 grand build cost. Thats a big extra and not money well spent. And they all make avoidable mistakes. People overestimate their (the experts) professionalism and under-estimate their own intuition.
Anybody self building will be trying to save costs so it pointless scolding them for not using expensive experts.
it is well accepted that by using professionals you will save money in the long run and also get more from your budget than without!!!!
I am bewildered at the construction industry. There are some very very genuine guys out there who are proud of their work and really want to do their best for you. BUT, there are way too many gangsters out there that couldn't give a toss and are only interested in getting into your house, doing as little as possible in as short a time as possible for the biggest price that they think they can squeeze out of you.
End of rant..................for the moment!
You wont be surprised to hear that I dont agree with the others.
1. Architects charge 10% of the estimated build cost - thats too much. 18 grand for basic planning permission drawings / 50 grand for detail drawings and 6 stage inspections.
2. engineers charge much much less - say 4 grand for detailed drawings that a builder and tradesmen can work of.
3. These days people generaly design their own house in their head and just need someone to do the drawings. - use an engineer or technician.
4. The structural numbers - the most vital info on the plans - come from a structural engineer - not an architect.
5. Project management costs way too much. You will end up standing on site pointing out the bits that they have missed to the builders.
6. QS costs about 1.5 - 3% and is a pointless spend for a house build as no builder will use them
Architects, Project managers & QS's will add 80 grand+ to a 420 grand build cost. Thats a big extra and not money well spent. And they all make avoidable mistakes. People overestimate their (the experts) professionalism and under-estimate their own intuition.
Anybody self building will be trying to save costs so it pointless scolding them for not using expensive experts.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?