Preparation of the substrate was essential for the 100mm of 65kn concrete I put on 75mm compacted hardcore on tamped and filled good subsoil with a 1:10 fall, so for a 50mm skim of tarmac on a steep slope I'd imagine its very important.
I have seen tarmac "settle" and "creep" when used in situations where it wasn't appropriate and I'd ask to see examples of the contractor's work in similar situations and go and see them.
Only then, having spoken to the owner, would I even think of proceeding, with the same preparation, if the ground conditions and exposure are similar.
HTH
ONQ.