10 mm cable 4 euro per metre,pull cord s/w 20 euro box 2 euro,rcbo in board 30 euro,labour 30 euro per hour,220 - 250 for the electrical side.
It's a Triton power shower
Edit: OK, for some reason I can't edit the thread title for the thread as a whole - only on selected posts
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?