Hi,
I had this issue 2-3 years ago, at the time one of the tradesmen recommended that I knocked away the front leaf of the cavity, then make a frame & pour a mass concrete step - with DPC & insulation lapped up in front of the inner leaf of the cavity - obviously you can lower the level of the step if there is to be a slab to be laid on top. This worked out well in my case - to be honest I can't remember why the guy recommended to do it this way but he was adamant it was superior to leaving the cavity under the door.
Dacman is correct, knock out the outside block and build your step out from there