Hi
I'm going for a TF build with a 35mm service cavity. I am also opting for radiators as the heating system - and want the piping to come out from the walls (as oppsed to up from the floor) for all rads.
I am just about the pour the floor (next week).
The plumber wants to lay the piping to the rads under the floor at this stage of the build but I would have assumed it would make a great deal more sense to wait until the tf is up and then do the piping in the service cavity area - isn't that the benefit of having a service cavity - or I missing something?
Anyone into plumbing who can offer an opinion as to use of service cavity in this regard?? All thoughts appreciated.
I'm going for a TF build with a 35mm service cavity. I am also opting for radiators as the heating system - and want the piping to come out from the walls (as oppsed to up from the floor) for all rads.
I am just about the pour the floor (next week).
The plumber wants to lay the piping to the rads under the floor at this stage of the build but I would have assumed it would make a great deal more sense to wait until the tf is up and then do the piping in the service cavity area - isn't that the benefit of having a service cavity - or I missing something?
Anyone into plumbing who can offer an opinion as to use of service cavity in this regard?? All thoughts appreciated.