The problem seems to be that the bend and connecting piece coming out of the gully should be dropping down into the main 4" run which would be at a lower level than the gully, instead the connection drops from the 4" striaght run down into the gully allowing waste to divert and flow into the gully.
Thanks buddyboy. The bottom of the gully is actually at a lower level than the main 4" waste running around the house.
The connecting piece's between gully and 4" comes out of the bottom on the gully, points upwards (its not a u-bend though), straightens and joins into the 4" main run.
So the problem is some of the waste passing in the 4" is able to divert, and drop down into the gully. What should happen is the connection into the main 4" should go be pointed slightly upwards, and then connect into a u-bend as you describe, this way waste can't divert into the gully as it passes.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?