Re: How much of new build needs to be completed before planning runs out? roof level?
The term is "Substantially Complete" and this is taken to mean that the structure has been erected up to wall-plate level.
This can mean that only the blockwork walls are brought up, with no windows, doors, render etc.
DBK100