Not that i'm moaning about the price being cheap..i just thought with the work that needed to be done it would be alot more expensive than what i was quoted. I triple checked with the builder what all the costs included, i didn't mis-hear.
I am getting 2 walls knocked down, a toilet and sink removed from the down stairs bathroom, all fittings to be rerouted into where the bathroom is i'm turning it into a utility room, there's a wall between where the washing machine is now and where i want it to be. Plug sockets to be put into utility room, A radiator is being re-moved. then every thing will be re-plastered on the ceiling and where ever else needed. All rubbish will be removed, and hey presto my kitchen is now bigger with a new utility room.
All for the price for 600 euro! ( not including the electrican, but the builder has said it will be around 100 ) He said something about taking up a couple of the floor boards upstairs for the electrican to do what ever he needs to do, but the builder said he would have all that ready for him, it will be cheaper as i will be paying for his time and this will make it quicker for him.
Is this what builders would normally charge? I'm a bit dim when it comes to these sort of things, i would of thought at least 1500-2000 euro for this job to be done.
SJ you are not going to get a good job for that price, it's way too low. It will end up costing you more in the long run. Have you checked out other work he has done?
Eng I don't know any skip for 100, more like 300 to 400
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?