Help, I am getting a drive ready for tarmac, got kerbing done at weekend, now had a guy putting in 6 gullies, 3 eaither side, and he is using 4 inch bends into 4 sewer pipe, i had cut 6 lengths of sewer pipe but when i got home tonight i found that instead of putting soakways in garden he has put some UNDER the drive. I have sat here thinking if I get a lot of rain its possible the soakway could get full and lift the drive?
Why it was not done as agreed is beyond me!
Am I worrying unduly.