Yes. The wire should be laid under the insulation, and brought throurh the screed usung a conduit. The back box for the socket only needs to be shallow therfore only a little chasin out is needed. The most important thing is to make the sparky aware that there is underfloor heating---- very important---to avoid a water feature as well. Their will be no problem laying these boards over then