The Boiler is only about 6 years old.
Basically I'm currently costing everything to get it done via direct labour.
Quotes received from building contractors to do the whole job varied as follows:
Got 4 quotes back for the exact same work.
€130k
€100k
€85k
€65k
None of the quotes gave detailed breakdowns of prices, even though it was requested, just a listing of the work that had to be done and the overall price they were quoting. After trying to get breakdowns off these guys for a number of weeks, I've got a pain in my This post will be deleted if not edited to remove bad language with them and decided that if I'm gonna have to be this hands on so early in the proceedings I might as well organise the whole project myself.
Whilst I am familiar with the work of the guys who gave me the higher 2 quotes, I am unfamiliar with the guys who gave me the lower quotes and am still waiting on references.
Thats why I've been pricing everything myself over the last week or 2 with a view to getting everything up and running and going direct labour starting within the next month or so.
I have got someone to to do the groundwork, blocks and electrics lined up. I plan on supplying all the materials myself too.