Hi
Have a mate who is an electrician. Dont know much about sparks prices but just checking to see what people think. Is it a good price
€1500 for below
Bathroom
Fit electric shower and wire to fuse board (showere already provided)
Supply and fit bathroom extractor fan
Fit power supply/switch for shower
Supply and fit 3 new bathroom downlights and switch
Kitchen
Fit power supply for Oven, Extractor Fan and Gas Boiler
Fit Thermostat for gas boiler
Supply and fit 3 new double sockets
Re location of existing double socket
Supply and fit of 2 fluorescent under counter lights
Suppply and fit of 4 kitchen down lights
Other
Supply/Fit/replacement of approximately 10 Old Sockets areound the house including chasing into walls
Chase Earth wire for fuse box into wall
Supply and fit new light into hallway
Supply and fit ceiling light into new downstairs storage area.
A lot of the messy work is already done as it is a renovation site at present. Floorboards/skirting is up already and easy access to most areas.
Just wondering ballpark figure is it a good price?
Thanks
Have a mate who is an electrician. Dont know much about sparks prices but just checking to see what people think. Is it a good price
€1500 for below
Bathroom
Fit electric shower and wire to fuse board (showere already provided)
Supply and fit bathroom extractor fan
Fit power supply/switch for shower
Supply and fit 3 new bathroom downlights and switch
Kitchen
Fit power supply for Oven, Extractor Fan and Gas Boiler
Fit Thermostat for gas boiler
Supply and fit 3 new double sockets
Re location of existing double socket
Supply and fit of 2 fluorescent under counter lights
Suppply and fit of 4 kitchen down lights
Other
Supply/Fit/replacement of approximately 10 Old Sockets areound the house including chasing into walls
Chase Earth wire for fuse box into wall
Supply and fit new light into hallway
Supply and fit ceiling light into new downstairs storage area.
A lot of the messy work is already done as it is a renovation site at present. Floorboards/skirting is up already and easy access to most areas.
Just wondering ballpark figure is it a good price?
Thanks