S
Couldn't it exist before August?I don't understand this? You're moving into a house that doesn't exist?
huh? I'm working in advance here. Ive signed up for a house with a completion date of August 2005.I don't understand this? You're moving into a house that doesn't exist?
So does this come up through the raft then? If so, I would need to get on to them right from the start so that they can allow for this?the sooner you talk to the sparks the better, because he may need to consult the builder to have the cable brought into the house beside the fuse board.
But do they allow for this normally. ie. is there a pipe from the utility/dishwasher area running to the outside??My sparks told me, that when someone asks for say lighting in the shed, or a power point in the shed, it just gets run out from the wire under the sink that is generally used as the power poitn for the dishwasher as well.
It sounds like a hole is just made through the wall to the outside, to facilitate running a cable??But do they allow for this normally. ie. is there a pipe from the utility/dishwasher area running to the outside??
ok, so this is the most cost effective way to do it then.(24/11/04 2:52 pm)
Reply         New Post .. he told me, this was before second fitting, that all they would do if I wanted powe rin shed, was to drill through the kitchen wall, underneath level of path, before path was poured. Run armoured cable out from under sink area, under where path woul dbe poured and leave a big coil of it for me to cut a path through my garden so it could get to where I put my shed.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?