Generally speaking 1mm per day. But as part of your floor is exposed this may not follow the usual pattern. If you can put some polythene cover, kept a few inches off the new concrete with planks on bricks to stop rain and heavy fog, over the area that should do the trick. Move the bricks around every couple of days. Batten down well.