Engineer Costs for Building

August

Registered User
Messages
78
Hi,

Just got a quote from my engineer. Just wondering if its a bit expensive?

Site Survey:
ˆ 1,200.00 (cleared site assumed)

Site Assessment for Septic Tank (SR6:1991):
ˆ 400.00 (client to provide excavator)

Planning Submission (including house plans as discussed with Damien):
ˆ 2,500.00

Build Supervision (6 visits):
ˆ 1,200.00

Declaration of Idendity:
ˆ 200.00

Certificate of Compliance:
ˆ 200.00

Subtotal:
ˆ 5,700.00

VAT @ 21%:
ˆ 1,197.00

TOTAL:
ˆ 6,897.00
 
Sounds there or thereabouts. Does the assessment for the septic tank cover percolation testing?
 
Good question. Will find out. If it is not inc. what will i be expected to pay?
 
Your 'P' or 'T' test results determine what treatment plant you will require and also what type of percolation type/area you will require ie standard or raised bed/linear meter.
You will have to pay to get the test holes dug, this will require a JCB of sorts, costs abour 2-300 euro
 
Last edited:
Good value. Working Drawing are missing from that list though. Included as part of the Planning or building from the Planning?
 